Onix Renewable
Onix Renewable
Get a Free Quote
India's Fastest 52 MW Group Captive
Hybrid Renewable Energy

India'sFastest52MWGroupCaptive HybridPowerPlant

Commissioned in a historic record 4 months, Onix Renewable's Wind + Solar hybrid power plants solve the intermittency challenge and provide round-the-clock green power to enterprise consumers.

Engineering Innovation

Solving the Intermittency Challenge with Wind & Solar Synergy

As solar and wind power now represent a dominant portion of India's energy expansion, variability in their natural generation has been the primary barrier to 100% renewable adoption.

Due to the complementary nature of their generation curves — wind turbines generating intensely during late evenings, nights, and the 4-month monsoon season, while solar panels peak during bright daylight hours — hybridization bridges generation dips and smooths out the transmission curve.

Eliminates reliance on costly fossil backup or diesel generators
Shared pooling substation and bay infrastructure cuts capital expenditure by 20–30%
Ideal for commercial and industrial (C&I) clients seeking Group Captive tariff exemption
Prepared for seamless addition of Onix BESS (Battery Energy Storage)
The 4-Month Hybrid Breakthrough
Historic Feat
Solar Component
Day Peak

High-efficiency TOPCon bi-facial arrays capturing direct and albedo light.

Wind Component
Night & Monsoon

High hub-height turbines spinning steadily through evening wind currents.

Continuous Power Output

By feeding both streams through our shared 66kV/220kV automated switchyard, industrial consumers receive stable, cheap green energy all 24 hours of the day.

System Advantages

Why Choose Onix Hybrid Power Plants?

A balanced clean energy architecture designed for maximum financial return and round-the-clock grid stability.

Complementary Generation Profiles

Solar generates peak energy during midday sunshine, while wind peaks in evening, overnight, and monsoon seasons, delivering round-the-clock (RTC) green power.

Higher Capacity Utilization Factor (CUF)

Achieves CUFs exceeding 45–50%, far outperforming standalone solar (19–24%) or standalone wind (30–35%) installations.

Shared Evacuation Infrastructure

Utilizes common pooling substations, internal 33kV lines, and high-voltage grid lines, dramatically slashing transmission fees and land footprint.

Record Fast-Track Commissioning

Onix completed India's fastest 52 MW Group Captive Hybrid plant in just 4 months from ground-breaking to grid synchronization.